Logo
Loading
0  /  100
keyboard_arrow_up
keyboard_arrow_down
keyboard_arrow_left
keyboard_arrow_right

Active Sites

Active Sites

At KAMM Group, our team is currently working on a number of exciting projects, from large-scale commercial sites to smaller, residential jobs.

With years of experience in the field, we’re proud to be trusted with a multitude of complex construction projects, securing contracts year after year.

To find out more about the jobs we’re currently working on, view a selection of our active sites below.

Boorley Green

Client
Bloor Homes, Bovis Homes & Linden Homes (Vistry)
Project value
Circa £70 million
Completion Date
2024

A former golf course, the project at Boorley Green amalgamates a consortium comprising of Bloor Homes, Bovis Homes & Linden Homes. It now features 1,400 homes, a school, a sports pitch, a community centre and local shops.

The area surrounding Hedge End has seen investment in multiple housing and infrastructure projects, and, in recent years, we’re proud to have been involved in the development.

KAMM began work in 2016 on the first phase of housing, along with the roads & sewers, and the construction of a new roundabout for access into the project. Since then, we’ve completed 11 further phases. The site was the pinnacle for KAMM, as it gave us the opportunity to expand, showcasing our capabilities to prospective clients on the larger schemes, whilst maintaining the quality to achieve their award-winning standards.

I

Boorley Gardens

Client
Miller Homes & Bellway Homes
Project value
Circa £45 million
Completion Date
2027

Miller Homes & Bellway Homes have collaborated on the 113 acres of Boorley Gardens to help bring 700 new homes to the region. Complete with a new school and shops, it will offer residents access to Botley village.

Since the commencement of the project in 2022, KAMM has undertaken infrastructure works that will provide over 4 miles of new access roads, along with associated sewers, footpaths, pump stations, detention basins etc., whilst also progressing the groundworks elements to the housing parcels.

I

Barton Farm Winchester

Client
Cala Homes
Project value
Circa £100 million
Completion Date
2030

Kings Barton has been a benchmark for CALA, with over 2000 homes to be built in total. It is the largest housing project for a single developer in Europe, offering access to the City of Winchester (former capital of England), along with its stunning cathedral.

Since the project commenced in 2016, KAMM is now in the third phase and has so far constructed in excess of 700 units along with associated infrastructure road and sewer works.

KAMM has so far also undertaken cut & fill works in excess of 150,000m3, with more to come.

It has been a fantastic opportunity for us to show our diverse range of skills. Once complete, the project will alter the landscape of Winchester.

I

Oaklands School

Client
Drew Smith
Project value
Circa £3 million
Completion Date
2023

Built on the location of the former school, Oaklands provides modern quality homes as standard from Drew Smith.

The project has been a fantastic opportunity for KAMM to show our ability to overcome challenges and manage a mixture of 278 and site works simultaneously.

I

Liphook

Client
Redrow Homes
Project value
Circa £6 million
Completion Date
2023

Just North of South Downs National Park, the Redrow Homes development at Liphook offers residents easy access to London and nearby schools. The nearby Radford Park provides an opportunity for peaceful walks and vast woodlands.

KAMM has undertaken the full scope of Civil Engineering works with a mixture of deep drainage and infrastructure along with the house groundworks element on this tight challenging development of 175 units.

I

Farnborough

Client
CALA Homes
Project value
Circa £6 million
Completion Date
2023

Circa 150 homes for CALA at Apollo Rise, offering a selection of semi-detached and detached homes. Encompassing the standard of the dream home guarantee that CALA offers their customers.

Close to Farnborough International Airport, it also boasts easy access to London. Since starting, KAMM has worked closely with CALA to coordinate a mixture of infrastructure, S278 works and the house groundworks element.

I

Hounsome Fields

Client
Vistry Homes Thames Valley
Project value
Circa £30 million
Completion Date
2027

Situated on the outskirts of Basingstoke, Hounsome Fields is surrounded by woodlands and is just 10 minutes from the town centre. Once complete, the project will boast over 750 dwellings. Thus far, Kamm has been fortunate to work on the first 4 phases, which have involved the construction of roads & sewers, associated footpaths, pump stations, Soakaway basins etc., along with all the groundwork elements traditionally associated with a housing scheme. Co-operation has been a focal point for KAMM on this project due to multiple phases running concurrently. It’s proven yet again that KAMM is capable of working in complex environments, whilst still producing outstanding results for our client.

I

Finchwood Park

Client
CALA Homes
Project value
£100 million
Completion Date
2032

The picturesque Finchwood Park is made up of over 140 acres, split into multiple phases.

Offering the area of Finchampstead a boost in its housing and infrastructure requirements, KAMM has so far undertaken two phases, along with accompanying 278 Works.

KAMM has also installed major drainage works, including multiple pumping stations, along with a number of basins, roads & foundations. Working closely with our valued client, Cala Homes, we are proud to showcase all of our skills in this prestigious development.

I

Arborfield

Client
Bloor Homes
Project value
Circa £7 million
Completion Date
2024

The Arborfield project by Bloor Homes gives residents a piece of the country, with the City of Reading just to the north. KAMM has undertaken significant infrastructure roads & sewers along with all the groundworks traditionally associated with a housing scheme of this nature.

Once complete, residents can roam the nearby countryside or get to London in under an hour.

I

Basingstoke Golf Club

Client
Bloor Homes
Project value
£7 million
Completion Date
2024

KAMM has been fortunate enough to be awarded two phases and the Section 278 works at the former golf course in Basingstoke. A 10-minute drive from Basingstoke City, surrounded by woodlands, Bloor Homes are building approximately 1,000 new dwellings.

Significant Section 278 works are currently being constructed by KAMM to join the project on the A30 trunk road, whilst also constructing the infrastructure roads & sewers. This also included the need for trenchless sewer construction in areas, along with the groundworks on each of the current housing phases.

Numerous machines and skilled operatives are making sure the project is progressing to our client’s requirements.

I

Berewood, Waterlooville

Client
Bloor Homes
Project value
Circa £7 million
Completion Date
2024

Encompassing two phases (5A & 3B), Berewood at Waterlooville has offered KAMM the chance to build 144 & 122 homes respectively for Bloor Homes Southern. Known locally as Woodlands Edge, the site allows easy access to acres of woodland and open spaces, as well as local schools, and only a 5-minute drive to the motorway network.

This project has given KAMM the perfect opportunity to demonstrate our speed and resourcefulness, along with our continued commitment to quality.

I